Data Center Construction Estimating Services for Contractors
We do takeoffs and priced estimates for data center shells, data halls, power, and cooling, split by building and phase. GCs, MEP subs, developers, and suppliers across the US send us their drawings.
Reviews from contractors and subcontractors who send us their bid estimates, takeoffs, and shop drawings.
Trustpilot
Review summary: Bart needed shop drawings on a tight schedule. The team discussed the project the same day, delivered drawings within a week, and completed minor revisions the following day. He praised their understanding of the scope, quick responses and progress updates.
Review summary: Ludin appreciated the professional team, their patience and guidance, and recommended BidAccurate for takeoff and shop drawing projects.
Data Center Estimates Organized by Building, Phase, and Hall
BidAccurate provides data center construction estimating services for projects across the US. We work from your civil, architectural, structural, electrical, and mechanical drawings and the specs. You get quantity takeoffs and priced estimates for the whole building, or just for the trades you bid.
A data center is mostly power and cooling wrapped in a building. The electrical and mechanical scope tends to outweigh everything else, the owner often buys the biggest equipment, and the job may be released one data hall at a time. We set up the estimate so each of those splits stays visible.
Takeoffs by building, phase, and data hall
Electrical gear counted by lineup and room
Feeders, tray, and piping measured by path
OFCI and CFCI equipment marked separately
Yards, pads, and site utilities on their own lines
The building itself is fairly simple. The money is in the power path, the cooling plant, the redundancy, and the question of who buys which piece of equipment.
01
Shell now, data halls later
Many data centers go out as a powered shell first, with data halls fitted out in later phases as tenants sign. One drawing set can hold three or four different scopes, and the bid form rarely splits them the way the drawings do.
How we handle it
We break the estimate out by building, phase, and data hall. Shell, core, and each fit-out phase get their own totals, so you can price today's scope and hold the rest as alternates.
02
Power distribution density
Electrical is usually the biggest scope on the job. Medium-voltage switchgear, transformers, UPS systems, generators, paralleling gear, PDUs, and overhead busway all stack up, and feeder runs between rooms are long and heavy.
How we handle it
We count gear by lineup and room, and measure feeders, conduit, and cable tray in LF by path. Duct banks and yard work are taken off separately from the gear inside the building.
03
Redundancy that doubles the count
N+1, 2N, and distributed redundant designs repeat equipment and pathways across A and B sides. It's tempting to count one side and double it. The two paths rarely run the same length, though, and sometimes they don't use the same gear.
How we handle it
We take off each path from the one-lines and plans as drawn. When the A and B sides differ, the estimate shows both instead of an average.
04
Air or liquid cooling
Air-cooled halls with CRAH units and hot-aisle containment look nothing like halls built for direct-to-chip liquid cooling with CDUs and secondary piping. Some projects show both. Others leave the liquid loop as a future phase and say so in one note on one sheet.
How we handle it
We measure chillers, cooling towers or dry coolers, air handlers, piping by size in LF, and containment from the mechanical drawings. Future or optional cooling scope goes on its own line.
05
Owner-furnished equipment
Owners often buy generators, switchgear, UPS modules, and chillers directly because of lead times. Someone on the contractor side still has to set it, connect it, and start it up. That split is easy to misread.
How we handle it
We list every major piece of equipment as OFCI or CFCI based on the documents. Install, rigging, and connection labor stay in your number even when the material doesn't.
06
Heavy site and structure
Large slab-on-grade footprints, generator and transformer pads, equipment yards, tilt-up or precast walls, and roof screens for rooftop gear add up fast. Utility duct banks and storm systems can run across the whole campus.
How we handle it
We take off concrete in CY and rebar by weight, and keep yard, pad, and site utility quantities apart from the building itself.
Data Center Projects We Estimate
A hyperscale campus and an edge site are both data centers. Past that, the scope, phasing, and who's paying have little in common.
Hyperscale Campus Buildings
Large single-tenant buildings on a multi-building campus, usually built in phases with shared substations and site utilities.
Multiple buildings
MV distribution
Generator yards
Phased data halls
Colocation Facilities
Multi-tenant buildings where data halls, cages, and suites get fitted out as space leases. The base building has to carry the power and cooling for future tenants.
Tenant data halls
Cages and suites
Meet-me rooms
Security systems
Powered Shell Buildings
The building, utility service, and core infrastructure, delivered ready for a tenant or owner to fit out the white space later.
Tilt-up or precast
Utility service
Roofing
Site and paving
Data Hall Fit-Outs and Expansions
Fitting out a new hall inside an existing building, or adding capacity to a live facility where shutdowns and tie-ins have to be planned.
Busway and PDUs
Containment
Cooling units
Live tie-ins
Enterprise Data Centers
Owner-operated facilities for one company, a hospital system, a university, or a government agency, often inside or next to an existing campus.
Raised or slab floors
UPS and generators
Fire suppression
Campus tie-ins
Edge and Modular Data Centers
Smaller facilities near users, or prefabricated power and IT modules set on a prepared site. Most of the field work is foundations, utilities, and hookups.
Equipment pads
Prefab modules
Utility service
Site work
Bidding a Data Center Project?
Send the drawings, specs, equipment schedules, and your bid date. We'll review the set and come back with the scope, phases, and a delivery date.
The budget moves when the power design firms up, when the owner buys gear, and when the next hall gets released. We revise the estimate each time and note what changed.
Stage 1 · Feasibility
Conceptual budgets
An early number built from the site, building size, critical IT load, and redundancy level. We list every assumption so you can see what the budget includes.
Stage 2 · Design
Design stage updates
As the one-lines, mechanical plans, and structure develop, we update the quantities and show which scopes moved.
Stage 3 · Bidding
Bid-ready estimates
Full takeoffs and priced estimates from the CDs, split by building, phase, and bid package.
Stage 4 · Value engineering
System alternates
Side-by-side pricing for options like cooling approach, wall system, or distribution layout when you or the design team bring them up.
Stage 5 · Construction
Addenda, changes, and next phases
Revised quantities for addenda and change orders, and updated estimates when the next data hall is released.
Who We Support on Data Center Projects
An electrical sub wants gear counts and feeder LF. A developer wants a budget to hold up against the GC's number. Tell us which one you are and we'll lay out the estimate that way.
General contractors
Full-building estimates by phase
A trade-by-trade number for shell, core, and each data hall, so you can level sub bids and price phases separately.
Electrical and mechanical subs
MEP takeoffs from the one-lines up
Gear counts, feeder and conduit LF, piping by size, and equipment lists that match how you price and buy.
Developers and owners
Independent budgets
An estimate to check against the GC's number, with cost per SF and, if you give us the IT load, cost per MW.
Suppliers
Material quantity lists
Counts and lengths for cable tray, conduit, wire, piping, and panels that you can quote from.
In-house estimators
Overflow support on big bids
Extra takeoff hours when a data center bid lands on top of everything else. We deliver in a format your team can check.
Data Center Numbers You Can Check
Phase and data hall breakouts
Shell, core, and each hall carry their own totals. Pricing a later phase doesn't mean starting the estimate over.
Clear equipment responsibility
Owner-furnished and contractor-furnished gear are marked line by line, so material and install labor don't get mixed up.
MEP quantities you can trace
Every feeder, tray run, and pipe size ties back to a color-coded markup on the plans.
Numbers in the units owners use
We report totals by trade and phase, per SF, and per MW of IT load when you give us the design capacity.
We provide accurate construction estimating and quantity takeoff solutions for commercial, residential, industrial, healthcare, education, hospitality, and public-sector projects.
What do you need from me for a data center construction estimate?
The current drawing set (civil, architectural, structural, electrical, mechanical, plumbing, and fire protection), the one-line diagrams, equipment schedules, specs, any addenda, the project location, and your bid date. Tell us which phases, buildings, or trades you want priced and whether you need quantities only or a priced estimate. If the owner has published an OFCI equipment list or a responsibility matrix, send that too.
Can you price the shell and each data hall separately?
Yes. We break the estimate out by building, phase, and data hall. The shell and core carry their own totals, and each fit-out phase is priced on its own. You can bid the first release and hold later halls as alternates or future work.
How do you handle owner-furnished equipment like generators and switchgear?
We list each major piece of equipment as owner-furnished (OFCI) or contractor-furnished (CFCI) based on what the documents say. For owner-furnished gear, we leave out the material but keep the setting, rigging, connections, and any support work the drawings assign to you. If the documents don't make the split clear, we flag it as a question for the bid.
Do you take off redundant A and B power and cooling paths separately?
Yes. We measure each path from the one-lines and plans as drawn instead of counting one side and doubling it. Where the A and B sides differ in routing, lengths, or equipment, the estimate shows both.
Which trades do you cover on data center projects?
Electrical, mechanical, HVAC, plumbing, concrete, rebar, foundations, structural steel, exterior wall systems, roofing, drywall, and sitework, plus the general requirements that go with them. You can ask for the full building or only your trade, so an electrical or mechanical sub can send just their scope.
Can you give a budget before the design is finished?
Yes. On early sets we measure what's drawn and write down the assumptions behind what isn't, such as redundancy level, cooling approach, and wall system. If you give us the critical IT load, we report cost per MW alongside cost per SF. When the next set comes out, we update the estimate and show what changed.
How do you handle addenda, alternates, and value engineering?
Each alternate gets its own line, and we tie every addendum to the quantities it changes. For VE, we price the systems you or the design team put forward, such as a different cooling approach or wall system, next to the base design.
How long does a data center estimate take, and do you stamp drawings?
It depends on building size, number of phases and trades, how complete the documents are, and our current workload. We review the set and confirm a delivery date before we start. BidAccurate also offers stamping services in all US states. Tell us which drawings and which jurisdiction, and we'll confirm the scope.
Let's Discuss Your Next Project
Partner with experienced construction professionals to deliver your project on time along with in budget.