BidAccurate Logo
Toggle navigation menu

Structural Steel Estimating Services for Fabricators, Erectors, and GCs

We take off beams, columns, bracing, plates, and connection material from your drawings. If you need a full number, we price the shop and field work too.

Nationwide coverage

We provide stamping services in all US states.

Get in Touch
Autodesk logo
PlanSwift logo
Bluebeam logo
RebarCAD logo

Client feedback

What contractors say about us

Reviews from contractors and subcontractors who send us their bid estimates, takeoffs, and shop drawings.

Trustpilot

Review summary: Bart needed shop drawings on a tight schedule. The team discussed the project the same day, delivered drawings within a week, and completed minor revisions the following day. He praised their understanding of the scope, quick responses and progress updates.

Bart, BTW Enterprises, INC.

Read review
Trustpilot

Review summary: Ludin appreciated the professional team, their patience and guidance, and recommended BidAccurate for takeoff and shop drawing projects.

Ludin Pierre

Read review

Read the original reviews on Trustpilot.

View all reviews
Estimator checking structural steel framing plans against beam, column, and connection takeoffs

Division 05 takeoffs and pricing

Steel Tonnage You Can Trace to the Drawings

Fabricators, erectors, general contractors, and steel suppliers across the US use our structural steel estimating services when they need tonnage they can defend. We read the structural set against the architectural drawings, count and weigh every member, and break out the connection material that a single tonnage figure tends to hide.

Beams, columns, HSS, bracing, plates, bolts, welds, and anchor rods are in the takeoff by default. Joists, deck, stairs, rails, and misc metals are different. Those packages get split between subs all the time, so we confirm who carries them before we count them.

  • Member marks, shapes, grades, lengths, and weights
  • Base plates, anchor rods, bolts, and shear studs
  • Shop work, galvanizing, and paint systems
  • Joists and deck only if they're in your package
  • Erection labor and crane time on request
  • Excel workbook plus marked-up PDF drawings
Send Us Your Steel Plans

What's Included in Our Structural Steel Estimating Services

We scope each job from the drawings, specs, addenda, and bid form you send. Below is what a typical steel package covers. A fabricator, an erector, and a GC each need a different slice of it, so we set the breakdown to match your bid.

Structural Members and Framing

We list each piece by mark, shape, grade, and length, then roll the weights up by level or erection sequence if the drawings give us enough to do it.

  • W-shape beams, girders, and columns
  • HSS, pipe, channels, angles, tees, and built-up members
  • Bracing, trusses, lintels, kickers, and support steel
  • Crane beams, screen framing, dunnage, and equipment supports

Connections and Accessories

Connection material comes off the typical details and connection schedules. Where connections are delegated to the fabricator's engineer, we carry a stated allowance and write down how we sized it.

  • Shear plates, clip angles, end plates, gussets, and stiffeners
  • Base plates, bearing plates, cap plates, and splice plates
  • High-strength bolts, nuts, washers, and anchor rods
  • Welds, shear studs, headed anchors, and connection allowances

Fabrication and Shop Work

Need shop pricing? Cutting, drilling, fitting, welding, and coating each get their own lines, so your shop rates land where they belong.

  • Sawing, coping, drilling, punching, fit-up, and shop welding
  • Plate cutting, beveling, cambering, rolling, and assembly
  • Shop drawings, detailing, material handling, and quality control
  • Galvanizing, shop primer, paint systems, and touch-up allowances

Erection and Field Activities

Field hours depend on how the frame goes up. We organize this part by erection sequence, site access, and whether connections are bolted or welded in the field.

  • Unloading, sorting, hoisting, plumbing, and temporary bracing
  • Field bolting, field welding, decking support, and punch work
  • Crane, lift, rigging, welding equipment, and mobilization
  • Travel, permits, protection, and cleanup

Related Metals and Scope Boundaries

Joists, deck, and misc metals often go to a different sub. Once you tell us how the job is split, we include them, leave them out, or carry an allowance.

  • Open-web steel joists, joist girders, bridging, and accessories
  • Roof deck, floor deck, pour stops, closures, and deck fasteners
  • Stairs, ladders, rails, grating, embeds, and miscellaneous metals
  • Fireproofing, field painting, engineering, testing, and permits

Measurement and Reporting

Units follow how each item is bought or priced. The assumptions behind them are written into the report.

  • Tons or pounds (LB) for members, plates, and connection material
  • Linear feet (LF) for members, welds, deck edges, and rails
  • Square feet (SF) for deck, grating, coatings, and fireproofing
  • Each (EA), labor hours, crane days, and other agreed bid units

Need a Steel Number Before Bid Day?

Send the plans, specs, addenda, and bid date, plus any pricing you want used. We'll look over the Division 05 scope and tell you what we'd measure and how we'd report it.

Request Your Steel Takeoff

Steel Takeoffs Your Estimator Can Price

Clear Division 05 Scope

Clear Division 05 Scope

We read the structural set alongside the architectural details, specs, and addenda. Lintels, canopy framing, and roof screen steel often show up there and nowhere on the framing plans.

Less Time Scaling Drawings

Less Time Scaling Drawings

Your estimator starts from counted members and weighed plates instead of a blank set, and spends the time on pricing.

Lists Your Supplier Can Quote

Lists Your Supplier Can Quote

Material is grouped by shape, grade, and length. That is how a mill or service center wants to see a quote request.

Fewer Dropped Items

Fewer Dropped Items

Base plates, anchor rods, shear studs, touch-up paint, and temporary bracing are easy to leave out of a steel bid. We check for each of them before the package goes out.

Markups You Can Check

Markups You Can Check

Measured members are color-coded on the drawings, and every line in the workbook carries a sheet reference.

Your Rates and Template

Your Rates and Template

Send your steel quotes, shop and field labor rates, crane costs, and waste factors. We build the estimate on your numbers, in your bid template.

Talk to a Steel Estimator

Why Choose BidAccurate for Structural Steel Estimating?

Frame tonnage is only part of a steel price. Connections, shop hours, coatings, freight, and crane time can move the number a lot, so each one stays on its own line.

01

The Whole Set, Read Together

Member schedules, sections, and connection notes don't always agree with the plans. We read them as one set and log the conflicts for you.

02

Weight and Piece-Level Detail

Group members by mark, grade, level, or erection sequence. Pick whatever matches how you buy steel and price labor.

03

Connections Stay Visible

Plates, stiffeners, bolts, and welds get their own lines. A connection allowance, if we carry one, is labeled as an allowance.

04

Scope You Can Audit

Exclusions and assumptions are listed with drawing references. Your estimator can see why a number is what it is, and change it.

05

Set Up Your Way

Excel and PDF, organized by your cost codes, bid items, fabrication sequence, or erection zones.

06

Addenda Updates

Send the revised set. We compare it with the last one, mark what changed in the steel, and update the takeoff under the revision scope we agree on.

Our Structural Steel Takeoff and Estimating Process

Five steps, from the day you send the drawings to the day you have a steel package you can price and check.

1

Send the Drawings

Upload the structural and architectural sets, Division 05 specs, addenda, and bid form. Include the project location, the bid date, and any connection design information you have.

2

Confirm the Steel Scope

Is it the frame only, or joists, deck, and misc metals too? We settle that with you, along with connection assumptions, alternates, and the report layout.

3

Count, Measure, Weigh

We take off members, plates, bolts, welds, anchors, and coatings, then sort them into the breakdown we agreed on.

4

Cross-Check the Set

Quantities get checked against sections, details, and specs. Gaps and conflicts go on a list for you to review.

5

Deliver the Bid Package

You get the Excel or PDF reports and marked-up drawings. If you asked for pricing, material, fabrication, erection, and equipment costs are in there too.

Have a steel bid package ready?

Send the current set. Tell us if you need quantities only, a fabrication estimate, an erection estimate, or both together.

Start Your Steel Estimate

Industries We Serve

We provide accurate construction estimating and quantity takeoff solutions for commercial, residential, industrial, healthcare, education, hospitality, and public-sector projects.

Commercial construction

Commercial Construction

Residential construction

Residential Construction

Industrial construction

Industrial Construction

Hospitality construction

Hospitality

Government and public sector construction

Government and Public Sector

Healthcare construction

Healthcare

Education construction

Education

Retail construction

Retail Construction

What you get back

Reports for Steel Quotes and Labor Planning

Send the material list out for mill or service center quotes. Use the shop and field breakdown to plan labor, compare alternates, or load the quantities into your own estimating software. We agree on the report layout before we start.

Member and Material List

Shapes, grades, lengths, piece counts, and weights. Plates, bolts, and anchors are listed on their own.

Marked-Up Drawings

Plans and details color-coded by level or zone, so you can see exactly what we measured.

Fabrication and Erection Estimate

Material, shop hours, field hours, cranes, and coatings, priced from your inputs or a basis we agree on up front.

Scope and Assumption Log

Exclusions, alternates, allowances, and the connection assumptions behind the numbers, all in one document.

Structural steel takeoff workbook next to color-coded framing plans showing member weights and connections

Related Construction Services

Need more than the steel? These services cover quantities, pricing, and drawings for the rest of the job.

Got Questions?
We've Got Answers.

What do you need from us to estimate structural steel?
The structural and architectural drawings, Division 05 specs, schedules, addenda, and bid form, plus the project location and bid date. If connections are delegated to the fabricator's engineer, send whatever design criteria you have. For a priced estimate, add your steel quotes, shop and field labor rates, equipment rates, and cost codes.
What's included in a structural steel takeoff?
Beams, columns, girders, bracing, HSS, angles, channels, plates, bolts, welds, shear studs, base plates, and anchor rods, along with coatings and marked-up drawings. Joists, deck, stairs, rails, grating, and misc metals are handled job by job. We include them, leave them out, or break them out separately depending on how your bid package is set up.
Is a steel takeoff the same as a steel estimate?
Not quite. The takeoff is the quantities: members, weights, connection material, and accessories. The estimate puts costs on those quantities, meaning material prices, shop and field labor, equipment, coatings, and freight. Overhead, profit, taxes, and allowances go on top if you want them carried.
How do you report structural steel quantities?
Members and plates are reported in tons or pounds, with piece counts and lengths. Bolts, anchors, and studs are counted EA. Welds go in LF, deck and coatings in SF. We add labor hours or crane days if you need them. You pick the breakdown: by mark, shape, grade, level, zone, or erection sequence.
What file formats do you deliver for a steel estimate?
Usually an Excel workbook, a PDF report, and color-coded PDF markups of the drawings. If you have your own spreadsheet, cost codes, or a preferred fabrication or erection breakdown, send it before we start and we'll work to it.
Can you update a steel estimate after an addendum?
Yes. Send the revised drawings and specs with a note on what you need updated. We compare them with the prior set and revise the affected members and scope. How long that takes depends on how much changed.
Can you use our own steel quotes and labor rates?
Yes. Send mill, service center, joist, deck, galvanizing, freight, or crane quotes, along with your shop and field rates, production assumptions, and markups. When those are part of the agreed scope, we build the estimate on your numbers.
How long does a structural steel estimate take?
It depends on the size of the frame, how complex the connections are, how complete the drawings are, and how much related metals work is in the package. Pricing detail and addenda matter too. We look at the documents first, then give you a delivery date.

Let's Discuss Your Next Project

Partner with experienced construction professionals to deliver your project on time along with in budget.

Services Interested In