BidAccurate Logo
Toggle navigation menu

Framing Estimating Services for Wood and Light-Gauge Steel

We take off walls, floors, and roofs by assembly, then price the install: layout, setting, sheathing, hardware, and the equipment to stand it up.

Nationwide coverage

We provide stamping services in all US states.

Get in Touch
Autodesk logo
PlanSwift logo
Bluebeam logo
RebarCAD logo

Client feedback

What contractors say about us

Reviews from contractors and subcontractors who send us their bid estimates, takeoffs, and shop drawings.

Trustpilot

Review summary: Bart needed shop drawings on a tight schedule. The team discussed the project the same day, delivered drawings within a week, and completed minor revisions the following day. He praised their understanding of the scope, quick responses and progress updates.

Bart, BTW Enterprises, INC.

Read review
Trustpilot

Review summary: Ludin appreciated the professional team, their patience and guidance, and recommended BidAccurate for takeoff and shop drawing projects.

Ludin Pierre

Read review

Read the original reviews on Trustpilot.

View all reviews
Estimator measuring wood and cold-formed steel wall assemblies on framing plans

Wood and CFS framing

Priced Wall by Wall and Floor by Floor

Framing subs, GCs, and homebuilders across the US use our framing estimating services when they want a number that follows how a crew builds. We split the job into wall types, floor systems, and roof systems, and measure each one from the architectural and structural sets.

That makes labor easier to price. A short interior partition and a tall exterior shear wall with hold-downs take very different crew hours, even at the same LF. Wood and cold-formed steel stay separate, and we mark anything that belongs to drywall, roofing, or the truss designer as excluded.

  • Wall types with studs, plates, headers, and openings
  • Floor and roof systems: joists, I-joists, rafters, trusses
  • CFS studs, track, headers, and bridging
  • Sheathing and subfloor tied to each assembly
  • Hangers, hold-downs, straps, and anchors
  • Crew hours, lifts, and cranes when you want pricing
Send Us Your Framing Plans

What's Included in Our Framing Estimating Services

We build the scope from your plans, wall types, framing layouts, and bid instructions. Some of the categories below won't apply to your job. Others, like CFS, may be split between you and the drywall sub, so we confirm that split before we count anything.

Wood Wall Framing

Each wall type is taken off on its own: stud size and spacing, plate height, treatment, and the openings in it. Headers and jack studs get counted per opening, not averaged across the floor.

  • Studs, king and jack studs, cripples, sole plates, top plates, and sill plates
  • Headers, posts, columns, built-up members, backing, blocking, and bracing
  • Bearing, nonbearing, exterior, interior, shear, shaft, parapet, and pony walls
  • Fire blocking, draft stopping, treated lumber, nailers, and furring when documented

Floor and Roof Framing

We count joists, rafters, and trusses from the framing plans level by level. The sections and details fill in blocking, cantilevers, and overbuilds.

  • Sawn joists, I-joists, rim boards, floor trusses, beams, and blocking
  • Rafters, ceiling joists, ridge, hip and valley members, lookouts, and trusses
  • LVL, LSL, PSL, glulam, built-up beams, posts, and other specified engineered wood
  • Stair, shaft, opening, dropped-area, cantilever, soffit, and overbuild framing

Cold-Formed Steel Framing

Load-bearing CFS and exterior infill go in their own section. Interior non-structural studs often belong to the drywall sub, so we ask before we include them.

  • Studs and track by depth, gauge, flange, spacing, wall type, and height
  • Headers, jambs, sills, boxed members, posts, joists, rafters, and trusses
  • Deflection track, slip connections, bridging, bracing, clips, and straps
  • Exterior infill, load-bearing, curtain-wall, soffit, parapet, and framed-opening systems

Sheathing, Subfloor, and Hardware

Sheathing is measured per assembly, so wall sheathing, subfloor, and roof deck stay apart. Hardware is counted at the connections the structural sheets show.

  • Plywood, OSB, structural panels, subfloor, roof deck, and gypsum sheathing
  • Panel thicknesses, ratings, layers, sheet counts, edge blocking, clips, and adhesives
  • Joist hangers, post bases and caps, hold-downs, anchors, straps, clips, and ties
  • Nails, screws, pins, bolts, washers, plates, sealants, and specified fasteners

Labor, Equipment, and Scope Boundaries

For a priced estimate, we attach install activities to each assembly and list what's excluded. Truss engineering is the usual one.

  • Layout, plating, wall build and stand, sheathing, and punch list
  • Material handling, staging, cranes, forklifts, lifts, and scaffolds
  • Crew production and labor hours, plus overhead and profit when agreed
  • Truss engineering, drywall, insulation, roofing, and finish carpentry marked as by others where they don't belong to you

Measurement and Reporting

Counts, LF, and SF: the units your crew lead and your supplier already work in.

  • Each (EA) for studs, joists, rafters, trusses, headers, and hardware
  • Linear feet (LF) of wall by type, plus plates, track, blocking, and bracing
  • Square feet (SF) or sheets for sheathing, subfloor, and roof deck
  • Labor hours, equipment days, or assembly units when the estimate is priced

Bidding a Framing Package?

Send the current plans, specs, addenda, and bid date. Include lumber or steel quotes and crew rates if you have them. We'll go through the set and tell you how we'd break out the takeoff.

Request Your Framing Takeoff

Framing Takeoffs Organized the Way Crews Build

Wall Types Matched to Layouts

Wall Types Matched to Layouts

We match the architectural wall types to the structural framing layouts. A shear wall called out on the structural sheets ends up on the right wall in your takeoff.

Less Time Measuring

Less Time Measuring

You start pricing from wall LF, member counts, and panel areas.

Quotes You Can Compare

Quotes You Can Compare

Your lumberyard, CFS supplier, and truss vendor each get the breakdown they need. When their quotes come back, you can line them up item by item.

Fewer Missed Items

Fewer Missed Items

Blocking, backing, built-up headers, hold-downs, and fire blocking are the usual misses on a framing bid. Each one has its own check in our takeoff.

Markups Your PM Can Follow

Markups Your PM Can Follow

Walls, floors, and roofs are color-coded on the plans, and each quantity has a sheet reference next to it.

Priced With Your Crew Rates

Priced With Your Crew Rates

Send your production rates, crew costs, and material quotes. We apply them as given and keep your cost codes.

Start a Framing Takeoff

Why Choose BidAccurate for Framing Estimating?

Labor drives a framing price, and labor depends on wall heights, openings, and connection details. We keep those in plain view so you can price them.

01

Both Disciplines in One Takeoff

Framing information is spread across wall types, elevations, sections, and the structural layouts. We pull it into one takeoff and flag the places where sheets disagree.

02

Wood and Steel Kept Apart

Wood is broken out by size and grade, CFS by depth and gauge. Each system has its own section of the estimate.

03

Openings and Connections Count

Headers, jamb studs, sills, hangers, and hold-downs show up as their own lines. You won't find them buried in an allowance.

04

Scope You Can Audit

Inclusions, exclusions, and open questions sit next to the quantities they affect, with the drawing reference.

05

Built Around Your Estimate

Excel and PDF, organized by building, level, wall type, phase, or cost code. We can also work inside your own spreadsheet.

06

Revisions After Addenda

Send the revised drawings. We compare them with the prior set and update the walls, floors, hardware, and labor that changed.

Our Framing Takeoff and Estimating Process

Here is how a set of framing plans becomes a priced estimate, start to finish.

1

Send the Plans

Architectural and structural sets, framing layouts, wall types, specs, addenda, and the bid form. Add the job location and bid date, and any supplier quotes or crew rates you want used.

2

Confirm the Framing Scope

Wood, CFS, or both? Who carries sheathing, hardware, trusses, and interior studs? We settle that first, then agree on a waste basis and how the report is laid out.

3

Measure by Assembly

We measure walls by type, count members and openings, and work out panel areas for each floor and roof.

4

Price Labor and Material

If you want a priced estimate, this is where your material quotes, crew production, labor rates, and lift or crane costs go in.

5

Check It Against the Set

We review the quantities across both disciplines. Conflicts, assumptions, and exclusions go on the scope log.

6

Deliver the Package

You get Excel or PDF reports, marked plans, and material and labor summaries, set up for your bid.

Got a framing set ready to go?

Send it over and tell us what you need: wood, CFS, quantities only, or a full labor and material estimate.

Start Your Framing Estimate

Industries We Serve

We provide accurate construction estimating and quantity takeoff solutions for commercial, residential, industrial, healthcare, education, hospitality, and public-sector projects.

Commercial construction

Commercial Construction

Residential construction

Residential Construction

Industrial construction

Industrial Construction

Hospitality construction

Hospitality

Government and public sector construction

Government and Public Sector

Healthcare construction

Healthcare

Education construction

Education

Retail construction

Retail Construction

Framing estimate outputs

Built for Bidding and Crew Planning

Send the material breakdown to your lumberyard, CFS supplier, or truss vendor. Use the labor numbers to plan crew size, compare sub coverage, or load quantities into your estimating system. The estimate is a bidding tool. It doesn't replace structural design, truss engineering, shop drawings, field verification, or your own means and methods.

Framing Quantity Takeoff

Members, wall LF, and panel SF grouped by assembly, floor, or area, with wood and CFS separated.

Labor and Cost Estimate

Crew hours, material, lifts, and delivery, priced on the basis we agree with you. Indirects are added if you ask for them.

Color-Coded Plan Markups

Walls, floor systems, roof framing, and sheathing marked in color, so you can check coverage without re-measuring.

Scope and Assumption Log

Waste assumptions, delegated-design items like trusses, exclusions, and anything the drawings left unclear.

Framing estimate workbook with wall assemblies, sheathing, hardware, and crew labor beside marked-up plans

Related Construction Services

Framing runs into carpentry and drywall on most jobs. These services cover those packages.

Got Questions?
We've Got Answers.

What do you need to put together a framing estimate?
Architectural and structural drawings, framing plans, wall types, sections, details, specs, addenda, and the bid form, along with the job location and bid date. If you want it priced, include your lumber, CFS, truss, and hardware quotes, your crew rates and production numbers, and your waste factor and cost codes.
What does a framing takeoff cover?
Walls, floors, and roofs, measured by assembly. Studs or track, plates, headers, posts, beams, joists, rafters, trusses, sheathing, subfloor, blocking, bracing, and hardware all come off the drawings, and install activities can be added. What's actually in your takeoff depends on the documents and on who carries what on the job.
Is a framing takeoff the same as a framing estimate?
No. A takeoff tells you what's there: members, panels, hardware, and assemblies. An estimate tells you what it costs to build. That adds material pricing, crew production and labor rates, lifts or cranes, delivery, and waste, plus any overhead, profit, or allowances you want carried.
How do you measure and report framing quantities?
Studs, joists, rafters, trusses, posts, and hardware are counted EA. Walls, plates, track, and blocking go in LF. Sheathing and subfloor are in SF or sheets. If you're pricing labor, we report by assembly and add labor hours. The report can be grouped by building, level, wall type, or roof area.
What formats will my framing estimate come in?
Excel workbooks, PDF reports, and color-coded PDF plan markups. Tell us how you want it organized before we start, whether that's by building, level, wall type, framing system, phase, or cost code. We can also work inside your own spreadsheet.
Can you revise a framing estimate after an addendum?
Yes. Send the revised drawings and tell us what you want updated. We'll compare the new sheets with the old ones and adjust the walls, floors, roofs, hardware, and labor that changed. Turnaround on a revision depends on how much the addendum touches.
Can you price the framing with our own quotes and crew rates?
Yes. We can use your lumber, CFS, truss, engineered wood, and hardware quotes, plus your crew rates, production assumptions, waste factors, and markups. Every rate and quote we use is listed in the estimate, so you can check it.
What affects how long a framing estimate takes?
Project size, the number of wall types and framing systems, opening and connection complexity, and how complete the drawings are all play in. So does the level of pricing detail and any addenda. We review the set first and then confirm a delivery date.

Let's Discuss Your Next Project

Partner with experienced construction professionals to deliver your project on time along with in budget.

Services Interested In