Our mechanical estimating services cover the combined Division 22 and 23 package: hydronic and steam piping, central plant equipment, ductwork, controls, insulation, and the labor to put it all in.
Reviews from contractors and subcontractors who send us their bid estimates, takeoffs, and shop drawings.
Trustpilot
Review summary: Bart needed shop drawings on a tight schedule. The team discussed the project the same day, delivered drawings within a week, and completed minor revisions the following day. He praised their understanding of the scope, quick responses and progress updates.
Review summary: Ludin appreciated the professional team, their patience and guidance, and recommended BidAccurate for takeoff and shop drawing projects.
BidAccurate provides mechanical estimating services for mechanical contractors, pipefitting and sheet-metal subs, general contractors, and in-house estimating teams across the US. This service is for the combined package: a central plant, hydronic loops, ductwork, and the controls that tie them together, priced as one bid.
On those jobs the trouble shows up at the seams. A pump is on the schedule but not the plan. Process piping is drawn on the plumbing sheets. Nobody says who carries the control valves. We read the mechanical set alongside the plumbing, electrical, and structural drawings, then write down where your scope ends so you price it with the boundaries in view.
Chilled water, heating hot water, condenser water, and steam piping
Chillers, boilers, pumps, AHUs, and other scheduled equipment
Supply, return, and exhaust ductwork with air devices
Valves, specialties, hangers, and insulation
Controls and TAB, priced in or split out
Excel or PDF reports with marked-up mechanical sheets
What's Included in Our Mechanical Estimating Services
We scope each job from what you send: mechanical drawings, schedules, flow diagrams, specs, addenda, alternates, and the bid form. A pipefitting sub who only wants the hydronic side and a GC who needs the whole Division 23 number get different inclusions, so tell us which one you are.
Ductwork and Air Distribution
Sheet metal carries its own fabrication and labor numbers, so we keep it apart from the piping. Duct is split by service and pressure class first, then by shape, gauge, and liner or wrap.
Supply, return, outside-air, relief, and exhaust duct by pressure class
Rectangular, round, spiral, oval, and flex duct, with gauge where scheduled
Fittings, transitions, plenums, taps, and volume and fire/smoke dampers
Diffusers, grilles, registers, louvers, VAV boxes, hangers, and supports
Hydronic, Steam, and Process Piping
Every run is taken off by system and size, with material and joining method noted: welded or grooved steel, copper, or plastic, whatever the spec calls for. Your foreman can find each footage on the markup.
Chilled water, heating hot water, condenser water, and glycol loops
Steam, condensate return, refrigerant, fuel oil, and equipment drains
Process and specialty piping when it sits in the mechanical contract
Valves, strainers, specialties, sleeves, anchors, guides, and hangers
Central Plant and Equipment
Each tagged unit on the schedule gets its own line with capacity, location, and what the vendor quote covers. Curbs, isolation, and rigging sit next to the unit they belong to.
Chillers, boilers, cooling towers, pumps, and plate heat exchangers
AHUs, RTUs, makeup-air units, heat pumps, and VRF condensing units
Expansion tanks, air separators, chemical feeders, coils, and fans
Curbs, rails, vibration isolation, rigging, and factory startup
Controls, Insulation, and TAB
These are often bought out to specialty subs. We carry each as its own line or as an allowance, based on the spec and the controls responsibility matrix.
Building automation panels, sensors, actuators, and control valves
Pipe insulation and jacketing, duct wrap, duct liner, and vapor retarders
Testing, adjusting and balancing, flushing, chemical cleaning, and commissioning support
Fire/smoke damper interfaces, pipe and valve tags, and closeout items
Labor, Rigging, and Trade Lines
Where mechanical stops and electrical, plumbing, or the GC picks up changes from job to job. We write the split down instead of guessing.
Shop fabrication, field installation, supervision, and shift premiums
Cranes, lifts, hoisting, core drilling, and trenching for buried pipe
Mechanical demolition, temporary heating or cooling, and firestopping
Power wiring, plumbing, and site utilities only when the contract assigns them
Units and Report Layout
Bid units follow how mechanical work gets bought and installed. Alternates and allowances stay off the base-bid lines.
Linear feet (LF) of pipe and duct by size, material, and system
Pounds (LB) or SF of sheet metal, and SF or LF of insulation
Each (EA) for equipment, valves, fittings, dampers, and devices
Labor hours, crew days, and totals by system, floor, or your cost codes
Bidding a Mechanical Package Soon?
Send the current drawings, schedules, specs, addenda, and any vendor quotes you already have, along with the project location and bid date. We'll look through the set and confirm what the takeoff and estimate will cover.
The M sheets rarely tell the whole story. We check them against the plumbing, electrical, structural, and architectural sets, plus the specs and addenda, because that's where missing curbs, sleeves, and equipment connections tend to hide.
More Time for Pricing
Hand us the counting and measuring. Your estimator stays on vendor calls and coverage.
Cleaner Vendor Comparisons
Material lists come out by system: sheet metal, pipe and fittings, insulation, controls, equipment. Lining three equipment quotes up against the schedule gets much easier.
Fewer Missed Items
Valves, hangers, dampers, flex connectors, rigging, startup. We run a checklist on the small stuff that slips through on a rushed bid day.
Markups You Can Check
Color-coded sheets show what we measured, and each quantity points back to a drawing. Assumptions, exclusions, and alternates are written out where you can see them.
Your Numbers, Your Format
Send labor units, crew rates, supplier quotes, or your company estimate template and we'll build on them. If you don't have them, we agree on a pricing basis up front.
A mechanical bid pulls together several piping systems, air-side work, scheduled equipment, shop and field labor, and pieces another trade may carry. We keep each of those inputs traceable from the first document review to the final workbook.
01
Schedules Checked Against Plans
Tags on the equipment schedule should match the plans and the flow diagrams. When they don't, we flag the mismatch in the scope log instead of quietly picking one.
02
Organized by System
Roll quantities up by chilled water, heating hot water, supply air, equipment tag, floor, zone, or the cost codes you already use.
03
Labor You Can See
Labor units, crew mix, access conditions, and rigging sit on their own lines. Want to bump productivity down for a cramped mechanical room? You can.
04
Written Trade Splits
Plumbing, controls, power wiring, firestopping, TAB, and process piping are each marked included, excluded, or by others, per the responsibility split you confirm.
05
Files That Fit Your Workflow
We deliver Excel and PDF. Tell us your bid form, supplier packages, or estimate template and we'll lay out the workbook to match.
06
Addendum Updates
Send the addendum and we compare it to the last set, show what changed in pipe, duct, equipment, and controls, and update the agreed takeoff or estimate.
Our Mechanical Takeoff and Estimating Process
We follow the same sequence on every mechanical job, and each step leaves a trail your team can check.
1
Send the Documents
Upload the mechanical and plumbing sheets, equipment schedules, riser and flow diagrams, specs, addenda, and bid form. Include the location and bid date, plus any architectural or electrical sheets that touch mechanical work.
2
Agree on Scope
We confirm which systems are yours, how controls and TAB are handled, any alternates or allowances, and whether you want quantities only or full pricing.
3
Take Off the Systems
Duct and pipe get measured by system and size. Equipment, valves, dampers, air devices, hangers, and insulation are counted or measured to match.
4
Apply Pricing and Labor
For a priced estimate, we add material costs, vendor quotes, labor units or crew rates, rigging, freight, and the indirects you've approved.
5
Cross-Check
Quantities are checked against plans, diagrams, schedules, and specs before anything ships. Conflicts and open questions go in the scope log.
6
Receive the Package
You get the Excel or PDF estimate, material and labor summaries, scope notes, and color-coded plan markups, organized the way we agreed.
Got a mechanical set ready to go?
Send it over and tell us what you need: quantities only, shop and field labor, your vendor quotes plugged in, or a full priced estimate.
We provide accurate construction estimating and quantity takeoff solutions for commercial, residential, industrial, healthcare, education, hospitality, and public-sector projects.
Commercial Construction
Residential Construction
Industrial Construction
Hospitality
Government and Public Sector
Healthcare
Education
Retail Construction
Mechanical estimate deliverables
What You Get Back From Us
Use the package to get equipment and material quotes, compare vendor coverage, check shop and field labor, plan purchasing, or load quantities into your estimating software. It's an estimating tool. It doesn't replace mechanical design, load calculations, equipment selection, coordination drawings, or permit documents.
Mechanical Quantity Takeoff
Pipe and duct footage by system and size, plus equipment, fittings, valves, dampers, devices, hangers, and insulation.
Labor and Cost Estimate
Material and equipment costs, shop and field labor, vendor quotes, rigging, and testing, extended from the pricing basis we agreed on.
Color-Coded Plan Markups
Marked sheets showing every run and unit we counted. Colors follow the systems, so chilled water and heating hot water are easy to tell apart.
Scope and Assumption Log
Inclusions, exclusions, alternates, allowances, and open questions, each tied to a sheet reference.
Other Services for Mechanical Bids
Bidding only one division? Use the HVAC or plumbing pages. You can also pair a mechanical estimate with a quantity-only takeoff, a full project estimate, BIM coordination, or shop drawings.
What do you need from me to start a mechanical estimate?
The mechanical drawings, equipment schedules, piping and riser diagrams, controls sequences or points lists if you have them, specs, addenda, and the bid form. Tell us the project location and bid date too. Architectural, structural, and electrical sheets help where they touch mechanical work, and so do any vendor quotes, labor rates, cost codes, or estimate template you want us to use.
What does a mechanical takeoff include?
Whatever the agreed scope says. On a combined package that usually means hydronic, steam, and refrigerant piping, ductwork and air devices, scheduled equipment, valves and specialties, hangers, insulation, and controls devices, plus marked-up drawings. Plumbing, process piping, fuel systems, firestopping, and power wiring go in only if the documents and your contract put them in the mechanical package.
Is a mechanical takeoff the same thing as a mechanical estimate?
No. The takeoff is the quantities: feet of pipe and duct, equipment counts, valves, fittings, and so on. The estimate puts prices on them. It adds material and equipment costs, shop and field labor, vendor and sub quotes, lifts and rigging, testing, and whatever overhead, profit, tax, or allowances we've agreed to carry.
How do you measure and report mechanical quantities?
Pipe and duct go in linear feet, broken out by size, material, and system. Sheet metal can also be shown in pounds or square feet. Insulation is in SF or LF depending on whether it's on duct or pipe, and equipment, valves, fittings, dampers, and devices are counted each. We can roll totals up by system, floor, zone, bid item, or cost code, and add labor hours or crew days if you're pricing labor.
What file formats do I get with a mechanical estimate?
Usually an Excel workbook (quantities or full cost), a PDF report, a scope and assumption log, and color-coded PDF markups of the mechanical sheets. Before we start, we'll settle how to organize it: by system, equipment tag, floor, phase, cost code, supplier package, or your own spreadsheet.
Can you update a mechanical estimate when an addendum comes out?
Yes. Send the addendum and any revised sheets, specs, schedules, or controls documents, plus a note on what you want updated. We'll compare the changes against the earlier set and revise the affected pipe, duct, equipment, labor, and pricing. How long that takes depends on how much changed and how clearly the addendum shows it.
Can you use our own equipment quotes, material pricing, and labor rates?
Yes, and we'd rather. If you send equipment, sheet-metal, pipe, insulation, controls, TAB, rigging, or freight quotes, along with labor units, crew rates, waste factors, tax, and markup, we'll build the estimate on them, as long as they're part of the agreed scope.
How long does a mechanical estimate take?
It depends on the job. Project size, the number of systems, how dense the piping and duct are, how complete the drawings are, how much controls and cross-discipline coordination is involved, the breakdown you want, any alternates or addenda, and our current workload all play into it. We look at the documents first, then give you a delivery date.
Let's Discuss Your Next Project
Partner with experienced construction professionals to deliver your project on time along with in budget.